Dust-free method for slate renovation "ZeroD-Roof"
Can be constructed without removing the existing roof! Suitable for large-scale roof renovations in factories and similar buildings.
"ZeroD-Roof" is a new construction method developed independently by Nakai that can be implemented without removing existing roofs. It allows for the revitalization of facilities without interrupting your business, such as factories, warehouses, and stores, while also avoiding the generation of industrial waste. By attaching our self-developed saddle to the hook bolt, we can carry out renovation work without drilling screws into the existing slate, ensuring that the factory can operate safely during the process. [Features] ■ Construction can be carried out while the factory is in operation ■ Peace of mind from not generating industrial waste ■ Suitable for improving leak prevention and thermal insulation *For more details, please refer to the related links or feel free to contact us.
- Company:仲井
- Price:Other